STRATEGI MINIMASI WASTE PROSES PRODUKSI KEMBANG TAHU MENGGUNAKAN PENDEKATAN LEAN MANUFACTURING DAN ANALISIS LINGKUNGAN KERJA
Keywords:
Lean Manufacturing, Value Stream Mapping, Waste, Manufacturing Lead Time, Process Cycle EfficiencyAbstract
Penelitian ini bertujuan untuk menganalisis dan mengurangi pemborosan (waste) dalam proses produksi kembang tahu pada UMKM Bapak Sapari dengan menerapkan metode Lean Manufacturing. Kondisi awal proses produksi menunjukkan Manufacturing Lead Time (MLT) sebesar 1.185 menit dan Process Cycle Efficiency (PCE) sebesar 42,61%. Metode analisis yang digunakan meliputi Flow Process Chart (FPC), Current State Value Stream Mapping (VSM), identifikasi tiga jenis pemborosan, analisis Fishbone berdasarkan pendekatan 6M, metode 5W+1H, serta penyusunan Future State VSM. Hasil identifikasi menunjukkan bahwa pemborosan utama meliputi waiting berupa penjemuran alami selama 480 menit dan perendaman selama 180 menit, transportation melalui pemindahan bahan secara manual sejauh 22 meter, serta inappropriate processing berupa proses pemerasan manual selama 40 menit. Alternatif perbaikan yang diusulkan mencakup penggunaan dryer box, pemasangan cerobong asap pada tungku, penataan ulang tata letak stasiun kerja dengan sistem FIFO, dan penerapan Standar Operasional Prosedur (SOP). Hasil rancangan Future State VSM menunjukkan bahwa waktu pengeringan dapat dikurangi menjadi 120 menit. Perbaikan tersebut menurunkan MLT sebesar 30,38% menjadi 825 menit dan meningkatkan PCE sebesar 18,60 poin persentase menjadi 61,21%. Dengan demikian, penerapan teknologi tepat guna dan standardisasi proses berpotensi meningkatkan efisiensi produksi UMKM.
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Budi Setiawan Sembiring, Budhi Santri Kusuma, Dede Ibrahim Muthawali

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Authors retain copyright and grant the proceeding right of first publication and this work is licensed under a Creative Commons Attribution-ShareAlike 4.0 that allows others to share the work with an acknowledgement of the works authorship and initial publication in this proceeding.
All articles in this proceeding may be disseminated by listing valid sources and the title of the article should not be omitted. The content of the article is liable to the author.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the proceeding's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this proceeding.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.
In the dissemination of articles by the author must declare the Seminar Nasional Teknik Industi [SNTI] as the first party to publish the article.