Abstract

The abstract should be clear, concise, descriptive and should provide a brief introduction to the problem. A statement: Electricity is a necessity that plays an important role in human life. So, the potential plan for Persada Tongra village is to build an environmentally friendly power plant that includes renewable energy. Terangun district, Gayo Lues Regency, has the potential of a river that can be used as a micro-hydro power plant (PLTMH) source. The purpose of this research is to find out how big the potential of water to generate electrical energy is in the river in Persada Tongra Village. The method used in calculating the water discharge in the river flow uses the floating method, and measurements are made using a stopwatch. Based on the measurement results at the location, it produces water potential with a maximum discharge of 1.16 m3/s, a total height of 1.47 m, and the highest generated power is 16.71 kW. It is hoped that the results of this study can later be used as an energy source where this energy source can be used to generate electricity in the Gayo Lues district.

References

[1] S. Ointu, F. E. P. Surusa, and M. Zainuddin, “Studi Perencanaan Pembangunan Pembangkit Listrik Tenaga Mikrohidro (PLTMH) Berdasarkan Potensi Air yang Ada di Desa Pinogu,” Jambura J. Electr. Electron. Eng., vol. 2, no. 2, pp. 30–38, 2020.

[2] A. Hasibuan, M. Sayuti, W. V. Siregar, F. Hidayatullah, R. Kurniawan, and R. Fahroji, “Optimizing Renewable Energy Potential for Tourism in Banyak Area, Aceh Singkil, Indonesia, Using Analytical Hierarchy Process as Alternative Energy,” in 2023 2nd International Conference on Computer System, Information Technology, and Electrical Engineering (COSITE), 2023, pp. 19–24.

[3] A. Hasibuan, W. V Siregar, and T. Elektro, “Prakiraan Kebutuhan Energi Listrik Kota Subulussalam Sampai Tahun 2020 Menggunakan Metode Analisis Regresi,” J. Rele, vol. 1, no. 2, pp. 0–4, 2020.

[4] A. Hasibuan, A. Asran, S. Yanti, M. Jannah, A. Bintoro, and A. Nrartha, “Effect of Variation in the Number of Blades on Turbine Rotation and Output Power at PLTPH (Picohydro Power Plant) Using a Kaplan Turbine,” Bull. Comput. Sci. Electr. Eng., vol. 4, no. 1, pp. 49–56, 2023.

[5] A. Hasibuan, M. Isa, and S. Anisah, “Analisa Teknologi Pembangkit Tersebar Sel Bahan Bakar Dan Pengaruhnya Terhadap Profil Tegangan Dan Rugi-Rugi Daya Sistem,” Saintek ITM, vol. 33, no. 2, pp. 20–28, 2020.

[6] L. Lindawati, E. K. Sari, and Y. Ermawati, “Potensi Energi Pembangkit Listrik Tenaga Mikro Hidro (PLTMH) Niagara Desa Rantau Nipis Kecamatan Banding Agung Kabupaten Ogan Komering Ulu Selatan,” J. Deform., vol. 6, no. 2, pp. 70–79, 2021.

[7] Y. T. Nugraha, M. F. Zambak, and A. Hasibuan, “Perkiraan Konsumsi Energi Listrik Di Aceh Pada Tahun 2028 Menggunakan Metode Adaptive Neuro Fuzzy Inference System,” Cess (Journal Comput. Eng. Syst. Sci., vol. 5, no. 1, pp. 104–108, 2020.

[8] Badan Lingkungan Hidup, “Kajian Lingkungan Hidup Strategis Kabupaten Sampang,” vol. 33, no. 15, 2010.

[9] E. Syahputra, Z. Pelawi, and A. Hasibuan, “Analisis Stabilitas Sistem Tenaga Listrik Menggunakan Berbasis Matlab,” Sisfo J. Ilm. Sist. Inf., vol. 2, no. 2, 2018.

[10] B. A. B. Ii and K. Lokasi, “Rencana Pembangunan Jangka Panjang Daerah (RPJPD) Kabupaten Gayo Lues Tahun 2005-2025,” pp. 11–20, 2011.

[11] A. Purnama, “Studi Kelayakan Pembangunan Pembangkit Listrik Tenaga MikroHidro Studi Kasus: PLTMH Minggir Pada Saluran Irigasi Minggir di Padukuhan Klagaran Desa Sendangrejo Kecamatan Minggir Kabupaten Sleman,” J. UNSA Prog., vol. 15, no. OKtober, pp. 93–111, 2011.

[12] A. M. Dimyati, “Studi kelayakan potensi pembangkit listrik tenaga mikrohidro di desa setren kecamatan slogoimo kabupaten wonogiri,” Emit. J. Tek. Elektro, vol. 15, no. 2, pp. 1–10, 2015.

[13] M. Y. Rofandy, A. Hasibuan, and R. Rosdiana, “Analysis of the effect of bank capacitor placement as voltage drop increase in distribution network,” Andalasian Int. J. Appl. Sci. Eng. Technol., vol. 2, no. 1, pp. 11–24, 2022.

[14] K. Kusnadi, A. Mulyono, G. Pakki, and G. Gunarko, “Rancang Bangun Dan Uji Performansi Turbin Air Jenis Kaplan Sekala Mikrohidro,” Turbo J. Progr. Stud. Tek. Mesin, vol. 7, no. 2, 2018.