Calculation of Cost Budget Plan and Development of Implementation Method on Preservation of Aceh Selatan/Subulussalam Boundary Road - Sumut Province Boundaries

Authors

  • Husnita Master Student of Civil Engineering Department, Universitas Malikussaleh, Aceh, Indonesia
  • Jufriza Master Student of Civil Engineering Department, Universitas Malikussaleh, Aceh, Indonesia
  • M. Faisal
  • Iqbal Master Student of Civil Engineering Department, Universitas Malikussaleh, Aceh, Indonesia
  • Jufandi Master Student of Civil Engineering Department, Universitas Malikussaleh, Aceh, Indonesia
  • Herman Fithra Lecturer of Civil Engineering Departement, Universitas Malikussaleh, Aceh, Indonesia
  • Maizuar Lecturer of Civil Engineering Departement, Universitas Malikussaleh, Aceh, Indonesia

DOI:

https://doi.org/10.29103/micoms.v3i.226

Keywords:

Cost Budget, S Curve, Implementation Method

Abstract

Cost Budget Plan is a calculation of the amount of money needed for materials, tools and wages, as well as other costs related to project implementation. Goals to be achieved to recalculate the budget Road Reconstruction Workand the method of implementation in which there are work methods for tools, K3, quality control, and the S curve regarding cost, quality and the right time. The results obtained from the calculation, Preservation Reconstruction of the South Aceh Boundary Road / Subulussalam -Boundaries of North Sumatra Province The total budget cost is Rp. 3.412.934.913.00 As well as scheduling the implementation time using the S curve. The preparation of the Implementation method applied to the Project includes Ordinary Excavation, Asphalt Pavement Excavation without Cold Milling Machine, Grain Pavement Excavation, Selected Piles from excavation sources, Road Body Preparation, Grade Aggregate Foundation Layer A, Class B Aggregate Base Layer, Binder Impregnating Layer - Liquid/Emulsion Asphalt, Binder Impregnating Layer - Liquid/Emulsion Asphalt, Laston Wear Layer (AC-WC), Laston Intermediate Layer (AC-BC), Laston Foundation Layer (AC- base), Anti-flaking agent, Thermoplastic Road Marking, Hot Mix Asphalt Improvement, and Plant Control. in an effective way based on the plans.

References

Ahmad Kholil. 2012. Heavy Equipment. Bandung: PT Juvenile Rosdakarya.

Bina Marga, 2016, Guidelines for Analysis of Work Unit Prices (AHSP)

Department of Public Works, Analysis of Work Unit Prices (AHSP) Public Works Sector, Jakarta: Ministry of Public Works and Public Housing.

Ervianto, 2003. Construction Project Management. Yogyakarta.

Ibrahim, H. Bachtiar. 1993.Plans and Real Estimates ofcost2nd.Jakarta: Earth Script.Rostiyanti, FS 2002. Heavy Equipment for Construction Projects. Jakarta: PT. Asdi Mahasatya.

Soedrajat, SA 1994. Analysis (Modern Method) Implementation Budget. Bandung: Nova Publisher.

Downloads

Published

2022-12-17