Calculation of Cost Budget Plan and Development of Implementation Method on Preservation of Aceh Selatan/Subulussalam Boundary Road - Sumut Province Boundaries
DOI:
https://doi.org/10.29103/micoms.v3i.226Keywords:
Cost Budget, S Curve, Implementation MethodAbstract
Cost Budget Plan is a calculation of the amount of money needed for materials, tools and wages, as well as other costs related to project implementation. Goals to be achieved to recalculate the budget Road Reconstruction Workand the method of implementation in which there are work methods for tools, K3, quality control, and the S curve regarding cost, quality and the right time. The results obtained from the calculation, Preservation Reconstruction of the South Aceh Boundary Road / Subulussalam -Boundaries of North Sumatra Province The total budget cost is Rp. 3.412.934.913.00 As well as scheduling the implementation time using the S curve. The preparation of the Implementation method applied to the Project includes Ordinary Excavation, Asphalt Pavement Excavation without Cold Milling Machine, Grain Pavement Excavation, Selected Piles from excavation sources, Road Body Preparation, Grade Aggregate Foundation Layer A, Class B Aggregate Base Layer, Binder Impregnating Layer - Liquid/Emulsion Asphalt, Binder Impregnating Layer - Liquid/Emulsion Asphalt, Laston Wear Layer (AC-WC), Laston Intermediate Layer (AC-BC), Laston Foundation Layer (AC- base), Anti-flaking agent, Thermoplastic Road Marking, Hot Mix Asphalt Improvement, and Plant Control. in an effective way based on the plans.
References
Ahmad Kholil. 2012. Heavy Equipment. Bandung: PT Juvenile Rosdakarya.
Bina Marga, 2016, Guidelines for Analysis of Work Unit Prices (AHSP)
Department of Public Works, Analysis of Work Unit Prices (AHSP) Public Works Sector, Jakarta: Ministry of Public Works and Public Housing.
Ervianto, 2003. Construction Project Management. Yogyakarta.
Ibrahim, H. Bachtiar. 1993.Plans and Real Estimates ofcost2nd.Jakarta: Earth Script.Rostiyanti, FS 2002. Heavy Equipment for Construction Projects. Jakarta: PT. Asdi Mahasatya.
Soedrajat, SA 1994. Analysis (Modern Method) Implementation Budget. Bandung: Nova Publisher.
Downloads
Published
Issue
Section
License
Copyright (c) 2022 Husnita, Jufriza, M. Faisal, Iqbal, Jufandi, Herman Fithra, Maizuar
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
COPYRIGHT NOTICE
Authors retain copyright and grant the journal right of first publication and this work is licensed under a Creative Commons Attribution-ShareAlike 4.0 that allows others to share the work with an acknowledgment of the work's authorship and initial publication in this journal.
All articles in this journal may be disseminated by listing valid sources and the title of the article should not be omitted. The content of the article is liable to the author.
Authors are able to enter into separate, additional contractual arrangements for the non-exclusive distribution of the journal's published version of the work (e.g., post it to an institutional repository or publish it in a book), with an acknowledgment of its initial publication in this journal.
Authors are permitted and encouraged to post their work online (e.g., in institutional repositories or on their website) prior to and during the submission process, as it can lead to productive exchanges, as well as earlier and greater citation of published work.
In the dissemination of articles, the author must declare https://proceedings.unimal.ac.id/micoms/index as the first party to publish the article.